Croatia flag

COUNTRY EPR FEE GUIDE

Croatia packaging EPR fees and calculator.

Public packaging fees, organisations and source documents for Croatia, with QA-checked English where available and the official tariff wording always retained.

Published packaging EPR fees in Croatia run from about 0.02 to 0.20 EUR per kilogram, set by the material and its recyclability. Gramta holds 15 current pricing records from one named organisation or government fee system; the dataset was updated 24 Aug 2026. The calculator uses only weight-based rates that apply without guessing.

Dataset updated 24 Aug 2026

Maintained by Daniel Vaknine

Last full review 22 Aug 2026

1
PRO or scheme
15
current pricing records
1
with calculable fees
24 Aug 2026
dataset updated

Croatia packaging EPR fees at a glance

8 materials priced across 1 organisations

Dataset updated 24 Aug 2026

Paper and cardboard
0.05 EUR/kg
Glass
0.02 EUR/kg
Wood
0.02 EUR/kg
Plastic
0.054 – 0.20 EUR/kg
Composite packaging
0.054 – 0.10 EUR/kg

Estimate a packaging EPR fee in Croatia

Add each material you place on the Croatia market and its yearly weight for a sourced ballpark. The full reference below lists every published rate, including unit, fixed, formula and quote-only methods.

Add your packaging materials

Add each material you place on this market and its approximate yearly weight. Gramta multiplies each by its current sourced rate and adds them up.

This scheme prices some lines per kilogram and others per unit (per sales unit, package or order). Add every line that applies to your packaging; the estimate sums them.

See all 15 published fees in Croatia

How packaging EPR works in Croatia

Packaging EPR in Croatia runs through a single route, Fzoeu, so there is no PRO to choose between. Its published fees apply to every obligated producer in scope. Registration and the definitive list of approved organisations sit with the national register, linked in the organisations section below.

Fees are set per kilogram of each material and vary by recyclability. In Croatia, one route publishes weight-based rates you can estimate in the calculator above; unit-based, fixed and formula charges are listed in full below with their sources.

Packaging organisations and fees in Croatia

A producer responsibility organisation (PRO) is the organisation a business joins and pays to meet packaging recycling obligations. Some countries instead use a government fee system. Use the name from your contract or registration.

The fee lines below come straight from the canonical source records. QA-checked English translations appear first where available; the official local wording, code, charging method and primary source remain visible for verification. A draft translation is never shown as finished.

Official Croatia packaging register

Registration and the definitive list of approved organisations are held by the national authority.

Open the official register

Fzoeu packaging fee lines

Official name: Fond za zaštitu okoliša i energetsku učinkovitost (Environmental Protection and Energy Efficiency Fund)

Estimate with Fzoeu
View 15 fee records
Material or tariff lineScopePublished rateEffective periodEvidence
Aluminium
Aluminium – cans · čl. 10. st. 1. t. 7. c)Weight-based material feeOfficial tariff wording: Al–limenkeHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision.All packaging in the published scope54.42 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Composite packaging
Multilayer packaging for beverages and drinks · čl. 10. st. 1. t. 7. e)Weight-based material feeOfficial tariff wording: višeslojna ambalaža za pića i napitkeHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision.All packaging in the published scope54.42 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Multilayer packaging for other uses · čl. 10. st. 1. t. 7. f)Weight-based material feeOfficial tariff wording: višeslojna ambalaža za ostale namjeneHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision.All packaging in the published scope99.54 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Glass
Glass · čl. 10. st. 1. t. 7. b)Weight-based material feeOfficial tariff wording: stakloHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision.All packaging in the published scope19.91 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Other packaging category
Packaging for milk and liquid dairy products · Dodatak VI. (JNAB, milk exception)Per packaging or transaction unitOfficial tariff wording: ambalaža od mlijeka i tekućih mliječnih proizvodaHow this line applies: Reduced per-unit rate for milk and liquid dairy packaging. Additive to the per-tonne material rate; kR malus applies.Packaging in a deposit-return system0.0027 EUR per unit7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Per-unit packaging fee by number of packaging units · Dodatak VI. (JNAB)Per packaging or transaction unitOfficial tariff wording: Jedinična naknada za ambalažu prema broju jedinica ambalažeHow this line applies: ADDITIVE second component of the packaging fee, not an alternative: Dodatak VI. defines NGOAP = NVM + NJ, where NJ = JNAB × BJ × kR and BJ is the number of packaging units IN THE DEPOSIT SYSTEM. A producer of deposit-system beverage packaging therefore pays BOTH the per-tonne material rate AND this per-unit rate. kR malus (1 / 1.15 / 5) applies to this component.Packaging in a deposit-return system0.0133 EUR per unit7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Refundable deposit per unit of primary beverage packaging · čl. 4. st. 1. – Primary packagingPer packaging or transaction unitOfficial tariff wording: Povratna naknada za jedinicu primarne ambalaže od pićaHow this line applies: REFUNDABLE deposit (povratna naknada), a separate instrument from the naknada gospodarenja otpadom – do not add to EPR fee totals as a cost. Raised from 0,07 EUR: čl. 12. brings čl. 4. st. 1. into force on 2025-01-01, and čl. 10. st. 2. sets the pre-2025 amount at 0,07 EUR. Scope until 2026-12-31 (čl. 10. st. 3.): single-use PET, glass or metal beverage packaging ≥0,20 L and ≤3 L.Packaging in a deposit-return system0.1 EUR per unit1 Jan 2025 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Paper and cardboard
Paper and cardboard · čl. 10. st. 1. t. 7. g)Weight-based material feeOfficial tariff wording: papir, kartonHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision.All packaging in the published scope49.77 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Plastic
Other polymer materials for milk and milk drinks · čl. 10. st. 1. t. 7. k)Weight-based material feeOfficial tariff wording: ostali polimerni materijali za mlijeko i mliječne napitkeHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision. Reduced rate for milk / milk-drink packaging – a distinct scope, do not collapse into 'other_polymers'.All packaging in the published scope54.42 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Other polymer materials · čl. 10. st. 1. t. 7. j)Weight-based material feeOfficial tariff wording: ostali polimerni materijaliHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision. This is the catch-all plastics rate for everything that is not PET – nearly double the PET rate.All packaging in the published scope99.54 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
PET · Dodatak VI. / čl. 10. st. 1. t. 7. a)Weight-based material feeHow this line applies: TRANSITIONAL statutory rate. Applies 'Do donošenja odluke iz članka 3. stavka 5.' – i.e. until the Fund adopts and publishes its own unit-fee decision. During this period the Uredba fixes koeficijent ekomodulacije kE = 1 and koeficijent dostave podataka kR = 1. Full formula (Dodatak VI.): NGOAP = NVM + NJ, where NVM = JNA × mAP × kE. kR malus applies to the per-unit component: 1 if data filed by the 20th of the following month, 1.15 if filed up to three months late, 5 in all other cases (čl. 3. st. 3.).All packaging in the published scope54.42 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Plastic carrier bags · čl. 10. st. 1. t. 7. l)Weight-based material feeOfficial tariff wording: plastične vrećiceHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision. Highest packaging rate in the schedule – a deliberate malus on plastic bags.All packaging in the published scope199.08 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Steel and other metals
Ferrous metal – cans · čl. 10. st. 1. t. 7. d)Weight-based material feeOfficial tariff wording: Fe–limenkeHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision.All packaging in the published scope29.86 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Textiles
Textile · čl. 10. st. 1. t. 7. i)Weight-based material feeOfficial tariff wording: tekstilHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision.All packaging in the published scope19.91 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026
Wood
Wood · čl. 10. st. 1. t. 7. h)Weight-based material feeOfficial tariff wording: drvoHow this line applies: Transitional statutory rate; kE = 1, kR = 1 until the Fund's decision.All packaging in the published scope19.91 EUR per tonne7 Dec 2024 – 31 Dec 2026Open primary sourceChecked 22 Aug 2026

This is the tedious part

The number above is a rough guide for one scheme. Filing for real means doing this for every material and every country you sell into, adding the extra fees on top, and getting it exactly right, year after year.

  • You owe fees in every EU country you ship to, not just one.
  • Every product's packaging has to be weighed and sorted by material.
  • There are extra fixed fees, minimums, and higher rates for hard-to-recycle packaging.
  • And it has to be filed accurately, on time, every single year.

You don't have to do this by hand

Send us your sales and your packaging details once. Gramta works out the fees for every country you sell in and keeps each report up to date and ready to file.

Get started with Gramta

Search the Croatia rates

Search a material to find it across every Croatia scheme – or add another country's name to compare across markets.

Type at least two letters to search.

Croatia packaging EPR fee questions

How much does EPR cost in Croatia?

Packaging EPR fees in Croatia are charged per kilogram of each material, with the rate set by the material and often its recyclability grade. The total also depends on the organisation or government system you use, the packaging scope and the weight. This page lists 15 current pricing records and calculates the weight-based rates directly; negotiated or unpublished prices are marked, never guessed.

Which packaging organisation should I choose in Croatia?

Use the producer responsibility organisation named in your Croatia registration or contract. The known options in Croatia are Fzoeu. Where several compete, their prices and packaging scopes differ, so Gramta lists them but never selects a default for a business.

Which authority runs packaging EPR in Croatia?

Packaging EPR in Croatia is overseen by a national register and authority, linked from the organisations section of this page. You register there, then join or contract a producer responsibility organisation to meet the obligation. Gramta links the official register so you can confirm the current approved organisations yourself.

Do I need PPWR as well as packaging EPR in Croatia?

Most sellers in Croatia face both frameworks. Packaging EPR sets the recycling fees on this page; the EU Packaging and Packaging Waste Regulation (PPWR) adds design rules and a Declaration of Conformity that applies EU-wide, Croatia included. They run in parallel, and a product's recyclability grade increasingly drives the EPR fee under both.

When were the Croatia EPR fees checked?

The Croatia dataset was updated 24 Aug 2026. Every fee line also carries its own effective period, checked date and primary-source link. Expired fee lines are excluded from the current calculator.